The Capital Development Authority (CDA) announced on Wednesday that it has floated a tender for the Shahdara Dam project, which will become the first new water source for Islamabad in almost 30 years, with construction set to start soon.
CDA Chairman Sohail Ashraf said the PC-I outlines a two-year timeline, but the authority hopes to complete the dam in 20 months. The structure will be situated close to the Shahdara picnic area.
A CDA press release estimates the dam could supply roughly 5 to 10 million gallons per day, depending on final design, technical studies and operational plans.
Ashraf added that four check dams will be constructed at the Margalla Hills foothills near D-12, Shah Allah Ditta and Saidpur, and a project for 100 recharge wells will begin to boost the city's underground water table. Tenders for those check dams and wells have not yet been released.
Islamabad receives about 1,100 mm of rain each year, yet much of it runs off through nullahs. The CDA is also collaborating with the Japan International Cooperation Agency (JICA) on a comprehensive water supply, sewerage and drainage master plan.
The city's water demand stands at around 250 MGD, while the CDA currently provides about 70 MGD, mainly to urban zones, from Khanpur Dam, Simly Dam and tubewells. Rural areas largely depend on borewells and small schemes managed by the district administration.
During each monsoon, the CDA releases large volumes from Simly Dam, and Rawalpindi authorities release water from Rawal Dam, as no storage system exists for surplus water. The CDA also plans Chinot Dam in the Simly Dam catchment and Dotara Dam in the Khanpur Dam catchment area.